Leveling: scrape the bucket flat and control the leveling according to the benchmark pile;
Digging trench: dig the guide trench first, leave the side slope (hard 1:0.5, soft 1:1);
Loading: short turn (<90°), discharging height 30-50cm;
Uphill and downhill: drive wheel in front, avoid rapid acceleration/neutral gear.




